Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.14356/330
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ministry of Health and Population | |
dc.date.accessioned | 2013-04-07T22:17:44Z | |
dc.date.accessioned | 2022-11-08T10:14:22Z | - |
dc.date.available | 2013-04-07T22:17:44Z | |
dc.date.available | 2022-11-08T10:14:22Z | - |
dc.date.issued | 2010 | |
dc.identifier.uri | http://103.69.126.140:8080/handle/20.500.14356/330 | - |
dc.description.abstract | Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams. | en_US |
dc.language.iso | en_US | en_US |
dc.title | Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 | en_US |
dc.type | Technical Report | en_US |
Appears in Collections: | Post Graduate Grant (PG) Reports |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
590.pdf | 2.7 MB | Adobe PDF | View/Open | |
1_590.pdf | Research Report | 2.7 MB | Adobe PDF | View/Open |
2_590.pdf | Research Report | 2.7 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.