Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.14356/330
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMinistry of Health and Population
dc.date.accessioned2013-04-07T22:17:44Z
dc.date.accessioned2022-11-08T10:14:22Z-
dc.date.available2013-04-07T22:17:44Z
dc.date.available2022-11-08T10:14:22Z-
dc.date.issued2010
dc.identifier.urihttp://103.69.126.140:8080/handle/20.500.14356/330-
dc.description.abstractBackground: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams.en_US
dc.language.isoen_USen_US
dc.titleNepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015en_US
dc.typeTechnical Reporten_US
Appears in Collections:Post Graduate Grant (PG) Reports

Files in This Item:
File Description SizeFormat 
590.pdf2.7 MBAdobe PDFThumbnail
View/Open
1_590.pdfResearch Report2.7 MBAdobe PDFThumbnail
View/Open
2_590.pdfResearch Report2.7 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.